Project duration: 12 weeks
Size: 935 sq m
Location Stratford
IMG_2024_04_18_14_51_18_396

THE CHALLENGE

Eden was appointed to deliver a new bouldering centre in Aldgate for City Bouldering. With 935 sqm of space, and just 10 weeks to complete the project, the challenge was to transform a tired, outdated building into a modern climbing facility. The works required careful planning, beginning with the safe removal of asbestos-containing floor tiles, before stripping back the unit to create a blank canvas.

20250131_092535000_iOS

Preserving heritage with care

IMG_2024_04_18_14_51_18_396

Specialist craftsmanship

20250131_092434000_iOS 20250131_092434000_iOS
20250131_092535000_iOS

OUR SOLUTION

Drawing on our expertise in climbing wall installations and leisure fit outs, Eden managed every stage of the build. Works included:

  • Safe removal of asbestos flooring and strip-out of existing fixtures and fittings
  • Installation of a new raised structural floor for changing areas
  • Construction of partitions, plasterboard ceilings, and IPS panel systems for showers and W.C.s
  • Installation of sanitaryware, internal laminate doors, and fire doors
  • New flooring and full decoration to walls and ceilings
  • Mechanical and electrical installations, including power supplies, lighting, emergency lighting, CCTV, access control, data outlets, and fire alarms
  • Mechanical installation of a ventilation system and pipework for above-ground drainage
  • Design and installation of a sprinkler system

Installation of specialist climbing walls to create the main attraction

We have worked with Eden on numerous projects over the past 10 years. Their understanding of our needs, alongside their exceptional standard of finish and motivation to achieve amazing built environments, makes each project effortless. Eden continues to put The Trust’s needs first and I would not hesitate in recommending them.”

Ben Roman, Chief Executive, The Lighthouse Project

THE OUTCOME

The project was delivered on time and within budget, resulting in a modern, fully equipped bouldering centre ready to welcome climbers. The finished space combines high-quality facilities with a striking climbing environment, reflecting Eden’s ability to take on complex, large-scale leisure fit outs and deliver exceptional results.

 

20250131_092438000_iOS 20250131_092438000_iOS

GET IN TOUCH

0800 043 2639

Eden London UK Ltd
Unit 33, Woodside Industrial Estate,
Woodside, Thornwood, Epping,
Essex, CM16 6LJ

This field is for validation purposes and should be left unchanged.

Eden London UK Ltd
Unit 33, Woodside Industrial Estate,
Woodside, Thornwood, Epping,
Essex, CM16 6LJ