CAT A fit out London

CAT A vs CAT B FIT OUTS:
THE DIFFERENCE EXPLAINED

Author: Mitchell Brougton, Operations Director, Eden Build.
Reviewed July 2026.

If you are leasing, letting or refurbishing commercial space, you will hear the terms CAT A and CAT B almost immediately. They describe two different stages of finishing a commercial interior, they are usually paid for by different parties, and confusing them is one of the most common causes of budget surprises on office projects.

This guide explains what each category includes, who typically pays for what, how the two differ in cost and programme, and where newer terms such as shell and core and CAT A+ fit in. It is written from the contractor’s side of the fence: Eden has delivered both CAT A and CAT B projects across the UK since 2009.

Shoreditch-15

What is a CAT A fit out?

A CAT A (Category A) fit out takes a building from a bare shell to a lettable, functional space. It is almost always commissioned by the landlord or developer, and its purpose is to present the space to prospective tenants in a clean, compliant, market-ready condition.

A typical CAT A specification includes:

  • Raised access floors
  • Suspended ceilings
  • LED lighting to an open-plan layout
  • Heating, ventilation and air conditioning distributed across the floor
  • Basic fire detection and life-safety systems
  • Finished internal walls to the core and perimeter
  • WCs and, in many buildings, shower facilities within the core

What it does not include is anything specific to an occupier: no partitioning, no meeting rooms, no furniture, no branding, no tea points beyond core provision. A finished CAT A floor is deliberately blank — an open, serviced plate ready for a tenant to make their own.

Commercial Fit out

What is a CAT B fit out?

A CAT B (Category B) fit out turns that blank plate into a working environment for a specific occupier. It is commissioned and paid for by the tenant, and it is where design decisions about how the business actually works get built.

A typical CAT B scope includes:

  • Partitioning: meeting rooms, offices, quiet rooms, comms rooms
  • Reworked lighting, heating and ventilation to suit the new layout
  • Kitchens and tea points
  • Flooring finishes, decoration and acoustic treatment
  • Joinery, reception areas and branding
  • Furniture, AV and IT infrastructure (sometimes procured separately)
  • Any structural alterations the layout demands, such as new openings or staircases

Because CAT B involves design, specification choices and coordination with the occupier’s IT and furniture suppliers, it carries more variables than CAT A — which is why CAT B costs and programmes vary far more widely.

Shoreditch-4

Where shell and core fits in

Shell and core is the stage before CAT A: the completed structure, envelope, and central plant of a building, with common parts (lobbies, lifts, core WCs) finished but the office floors left as bare concrete and exposed services. Developers typically deliver shell and core, then either complete a CAT A themselves or agree a contribution for the incoming tenant to do so.

The usual sequence is: shell and core → CAT A → CAT B. On some projects the stages are combined, a tenant taking a whole building may go straight from shell and core to an integrated CAT A and CAT B under one contract, which can save both programme and money by avoiding work being installed and then stripped out.

Office Fit Out - Russell Square

What is CAT A+?

CAT A+ (sometimes called “plug and play”) is a landlord-funded fit out that goes beyond CAT A: the landlord installs partitioning, meeting rooms, a tea point, floor finishes and sometimes furniture, so a smaller tenant can move in with minimal work of their own. It has become common on floors aimed at occupiers of roughly 2,000–10,000 sq ft who want the certainty of a ready-made space and a shorter route to occupation.

For landlords, CAT A+ is a letting strategy: it widens the pool of tenants and shortens void periods. For tenants, it trades customisation for speed and a simpler transaction.

BB37D7BF-A101-4A03-9BA4-88889E492E78

Who pays for what?

As a rule of thumb:

  • Shell and core and CAT A — landlord or developer.
  • CAT B — tenant, though landlords frequently contribute through a capital contribution or rent-free period negotiated in the lease.
  • Reinstatement — most leases oblige the tenant to strip out their CAT B works and hand the space back in CAT A condition at lease end. This is the basis of most dilapidations claims, and it is worth understanding before you sign, not after. Our dilapidations service cover this in more detail.

Always confirm the boundary between CAT A and CAT B in your specific transaction. There is no statutory definition of either term; the lease and the agreed specification govern, and the boundary is negotiated differently on almost every deal.

0Q0A2495

Cost and programme: how the two compare

Exact figures depend on building condition, specification and location, but the relationship between the two categories is consistent: CAT B typically costs more per square foot than CAT A, and varies more.

Indicatively, in the current UK market, CAT A works commonly fall in the lower band of fit out costs per square foot, while CAT B ranges from modest refresh budgets to several times the CAT A rate for high-specification workplaces. Rather than quote a single misleading number here, we publish and maintain detailed ranges — drawn from our own delivered projects — in our [office fit out cost guide].

On programme: a straightforward single-floor CAT A is usually measured in weeks; a CAT B for the same floor typically takes longer once design development, procurement and occupier decision-making are included. Our fit out timeline guide breaks down realistic programmes by project size.

Office

Common points of confusion

“The space is fitted out, so it’s ready for us.” A CAT A floor is ready for a fit out, not for occupation. Budget for CAT B from the outset.

“CAT A is defined by law.” It isn’t. The British Council for Offices publishes widely used guidance, but the terms are market conventions. The specification appended to your lease or building contract is what counts.

“We can skip CAT A.” Sometimes you genuinely can, combining stages under one contractor avoids installing ceilings and services that the CAT B design would immediately alter. Whether that saving is available depends on timing and who controls the space. It is worth asking the question early; we price both routes when the option exists.

Does a tenant ever pay for CAT A works?

Occasionally, yes. Usually where a tenant takes space in shell and core condition and negotiates a landlord contribution instead. The cash flows differ, but the scope definitions stay the same.

Is furniture part of a CAT B fit out?

Furniture is usually classed as CAT C or FF&E and procured separately, though many occupiers ask their CAT B contractor to coordinate delivery and installation. Clarify this boundary when comparing tenders, it is a common source of non-comparable quotes.

What condition must we return the space in at lease end?

Typically CAT A condition, subject to the lease’s repair and reinstatement clauses. A schedule of condition taken at the start of the lease is the cheapest insurance against dilapidations disputes at the end of it.

Can one contractor deliver both CAT A and CAT B?

Yes, and where the timing allows it is usually more efficient. Eden delivers standalone CAT A, standalone CAT B, and combined programmes under JCT, traditional and design and build arrangements.

Considering a CAT A or CAT B project? Send us your floor plans or agent’s specification and we will return a budget estimate within five working days.

Call 0800 043 2639 or email [email protected].

GET IN TOUCH

0800 043 2639

Eden Build UK Ltd
Unit 33, Woodside Industrial Estate,
Woodside, Thornwood, Epping,
Essex, CM16 6LJ

This field is for validation purposes and should be left unchanged.

Eden Build UK Ltd
Unit 33, Woodside Industrial Estate,
Woodside, Thornwood, Epping,
Essex, CM16 6LJ