If you are leasing, letting or refurbishing commercial space, you will hear the terms CAT A and CAT B almost immediately. They describe two different stages of finishing a commercial interior, they are usually paid for by different parties, and confusing them is one of the most common causes of budget surprises on office projects.
This guide explains what each category includes, who typically pays for what, how the two differ in cost and programme, and where newer terms such as shell and core and CAT A+ fit in. It is written from the contractor’s side of the fence: Eden has delivered both CAT A and CAT B projects across the UK since 2009.
A CAT A (Category A) fit out takes a building from a bare shell to a lettable, functional space. It is almost always commissioned by the landlord or developer, and its purpose is to present the space to prospective tenants in a clean, compliant, market-ready condition.
A typical CAT A specification includes:
What it does not include is anything specific to an occupier: no partitioning, no meeting rooms, no furniture, no branding, no tea points beyond core provision. A finished CAT A floor is deliberately blank — an open, serviced plate ready for a tenant to make their own.
A CAT B (Category B) fit out turns that blank plate into a working environment for a specific occupier. It is commissioned and paid for by the tenant, and it is where design decisions about how the business actually works get built.
A typical CAT B scope includes:
Because CAT B involves design, specification choices and coordination with the occupier’s IT and furniture suppliers, it carries more variables than CAT A — which is why CAT B costs and programmes vary far more widely.
Shell and core is the stage before CAT A: the completed structure, envelope, and central plant of a building, with common parts (lobbies, lifts, core WCs) finished but the office floors left as bare concrete and exposed services. Developers typically deliver shell and core, then either complete a CAT A themselves or agree a contribution for the incoming tenant to do so.
The usual sequence is: shell and core → CAT A → CAT B. On some projects the stages are combined, a tenant taking a whole building may go straight from shell and core to an integrated CAT A and CAT B under one contract, which can save both programme and money by avoiding work being installed and then stripped out.
CAT A+ (sometimes called “plug and play”) is a landlord-funded fit out that goes beyond CAT A: the landlord installs partitioning, meeting rooms, a tea point, floor finishes and sometimes furniture, so a smaller tenant can move in with minimal work of their own. It has become common on floors aimed at occupiers of roughly 2,000–10,000 sq ft who want the certainty of a ready-made space and a shorter route to occupation.
For landlords, CAT A+ is a letting strategy: it widens the pool of tenants and shortens void periods. For tenants, it trades customisation for speed and a simpler transaction.
As a rule of thumb:
Always confirm the boundary between CAT A and CAT B in your specific transaction. There is no statutory definition of either term; the lease and the agreed specification govern, and the boundary is negotiated differently on almost every deal.
Exact figures depend on building condition, specification and location, but the relationship between the two categories is consistent: CAT B typically costs more per square foot than CAT A, and varies more.
Indicatively, in the current UK market, CAT A works commonly fall in the lower band of fit out costs per square foot, while CAT B ranges from modest refresh budgets to several times the CAT A rate for high-specification workplaces. Rather than quote a single misleading number here, we publish and maintain detailed ranges — drawn from our own delivered projects — in our [office fit out cost guide].
On programme: a straightforward single-floor CAT A is usually measured in weeks; a CAT B for the same floor typically takes longer once design development, procurement and occupier decision-making are included. Our fit out timeline guide breaks down realistic programmes by project size.
“The space is fitted out, so it’s ready for us.” A CAT A floor is ready for a fit out, not for occupation. Budget for CAT B from the outset.
“CAT A is defined by law.” It isn’t. The British Council for Offices publishes widely used guidance, but the terms are market conventions. The specification appended to your lease or building contract is what counts.
“We can skip CAT A.” Sometimes you genuinely can, combining stages under one contractor avoids installing ceilings and services that the CAT B design would immediately alter. Whether that saving is available depends on timing and who controls the space. It is worth asking the question early; we price both routes when the option exists.
Occasionally, yes. Usually where a tenant takes space in shell and core condition and negotiates a landlord contribution instead. The cash flows differ, but the scope definitions stay the same.
Furniture is usually classed as CAT C or FF&E and procured separately, though many occupiers ask their CAT B contractor to coordinate delivery and installation. Clarify this boundary when comparing tenders, it is a common source of non-comparable quotes.
Typically CAT A condition, subject to the lease’s repair and reinstatement clauses. A schedule of condition taken at the start of the lease is the cheapest insurance against dilapidations disputes at the end of it.
Yes, and where the timing allows it is usually more efficient. Eden delivers standalone CAT A, standalone CAT B, and combined programmes under JCT, traditional and design and build arrangements.
Considering a CAT A or CAT B project? Send us your floor plans or agent’s specification and we will return a budget estimate within five working days.
Call 0800 043 2639 or email [email protected].
LIGHTHOUSE PROJECT, NEWCASTLE
CIVIC CENTRE, THE WATER GARDENS, HARLOW
BRUNELLO CUCINELLI FIT OUT, MAYFAIR
Eden Build UK Ltd
Unit 33, Woodside Industrial Estate,
Woodside, Thornwood, Epping,
Essex, CM16 6LJ